How long does it typically take to install a 2000 sf wood shake or shingle roof? (in working days) | 1 day | 18% | 2 days | 13% | 3-5 days | 40% | 5-7 days | 18% | 7-14 days | 4% | Not sure | 4% | | | Question: How long does it typically take to install a 2000 sf wood shake or shingle roof? (in working days) Top Answer (40% of 22 votes): 3-5 days.
Answer: 1 day Explanation: Wood takes longer | Interstate Roofing | Answer: 2 days Explanation: This will depend on the roof design. | allstate exteriors & restoration services | Answer: 1 day Explanation: Replacing a roof, whether on a commercial or residential building, is a labor-intensive project and, depending on the type of roof, could take anywhere from a few days to 2 or more weeks. The time involved is substantially affected by the weather, as well. Wind, snow, rain, or even just the threat of one of these and will slow the process considerably. | RoofInspectorNM.com | | ProMatcher | Answer: 7-14 days Explanation: depends on the pitch of the roof being put on as cedar shingle roofs are installed by hand not with a nail gun so the take longer to install the right way so no leaks happen | metal masters construction.llc | Answer: 3-5 days Explanation: If you want it done right | Todd's Roofing & Siding |
|